Miscellaneous Renovations and Roof Restoration 1990
This project consisted of removal/expansion/renovation of existing special education classrooms, installation of a classroom unit ventilator, installation of new partition, lighting revisions, removal and disposal of existing smooth surface built-up roof membrane, temporary and permanent removal of existing metal flashing, guttering, gravel stops, roof drains and related items, removal/replacement of wood nailers and fascias, removal of existing roof curbs, minor repairs to existing lightweight concrete roof deck, installation of rigid roof insulation board, installation of fully adhered EPDM elastomeric roofing membrane and installation of new roof components including flashings, guttering, gravel stops, roof drains and other related items.
Life Safety Corrective Work 1991
Work consisted of removal/replacement of doors, frames and hardware, reglazing at exit doors, trophy cases, removal/replacement of roofing shingles, replacement of existing exit sidewalk, plumbing work including installation of vent piping on sinks and water coolers, new vacuum breakers, new trap on service sink, mechanical work including installation of combustion air dampered louver through wall at kitchen food storage area, and electrical work including expansion of system and replacement of various components in conjunction with building fire alarm system, repair/replacement of damaged exit signs and additional emergency lighting and related work.
Roof Replacement at 1979 Addition 1994
Work consisted of removal of existing smooth surface built-up bituminous roof including related flashings and underlying insulation, installation of single-ply, fully adhered EPDM roof membrane over new roof insulation board, installation of new perimeter sheet metal flashings and fascia covers, new EPDM flashings at roof curbs, wall and other penetrations and removal/replacement of deteriorated sections of the existing metal roof deck and wood blocking and nailers.
HVAC Modifications 1995
Work included installation of condensing units, refrigerant piping, power wiring and devices, new power panel and revisions to controls to convert seven (7) existing heating only unit ventilators with existing direct expansion cooling coils to heating and cooling units.
New Electrical Service 1997
This project consisted of demolition and removal of certain existing distribution equipment and feeders, new circuit breaker type switchboard, new meter and CT cabinet, new service feeders, new current limiting fuses and extension of existing feeders to new switchboard.
Classroom Addition 1998
A 8,200 sq. ft. addition for six classrooms to the existing building.Health and Life Safety Work 1988
Health and Life Safety Corrective Work 1993
This work consisted of the following repairs at the Central Campus and East Campus:
Central Campus
Repair of existing bleachers, including replacement of the base board supports and painting of all steel bleacher support frames at the Football Stadium; replacement/repair of doors and hardware, replacement of exiting glazing, modifying toilet rooms to comply with accessibility requirements, replacement of domestic hot water boiler, replacement of 100 l.f. of underground gas distribution piping, installation of vacuum breaker, new exhaust system components, installation of additional fire alarm system, additional emergency light, GFCI protected receptacles, new switchboard components, installation of handrails for exterior entrance stair, replacement of plumbing fixtures, new unit heaters, installation of backflow prevention devices, revision of ventilation.
East Campus
Removal/replacement of doors, frames and hardware, replacement of glazing, installation of new indirect ice maker waste connection, vacuum breakers at exterior wall hydrants, replacement of two electric water coolers, installation of combustion air dampers, repairing various exhaust fans, installation of additional heat detectors, installation of GFCI receptacles, replacement of Computer Room conduit, installation of new lighting fixtures and renovation of toilets for accessibility.
Chiller and Cooling Tower Replacement 1993
This project consisted of replacement of air conditioning chiller and cooling tower and all related work at the East Campus and replacement of air conditioning cooling tower and all related work at the Central Campus Learning Center.
Remodel of Stage Area 1988
Roof Renovations for Shop Building 1988
Miscellaneous Renovations 1991
Waltonville High School 2001
Asbestos abatement design for removal of asbestos containing materials.
Sandoval High School Elevator Addition 1986